Case Study: Strengthening Field Quality Control to Catch Install Issues Before They Impact Turnover

Time: 1:30 pm
day: Conference Day Two

Details:

  • Expediting the way we identify trade installation defects, including common misses like seismic restraints and vibration isolation
  • Using BIM-linked QC tracking to verify systems meet owner and code requirements before commissioning
  • Ensuring inconsistent MEP system knowledge among general contractors doesn’t lead to missed specs: How have we closed that gap?

Speakers: