Ensuring Early Trade Involvement to Improve Design Efficiency, Cost Management & Speed of Installation

Time: 8:40 am
day: Day One

Details:

  • Working with MEPs on the calculation of an accurate GMP and conceptual estimates to manage risk and provide realistic cost expectations
  • Addressing potential design challenges or bottlenecks with MEPs to forecast schedule delays and build in contingency
  • Encouraging MEPs to review design documents and share knowledge on installation during schematic design so that technical errors are not missed